From d798b01e898c03fbafd0ec63229d196a53c56e85 Mon Sep 17 00:00:00 2001 From: Pim van Pelt Date: Wed, 7 Sep 2022 18:12:18 +0200 Subject: [PATCH] Oops, math error. it's 1.4MW here --- content/blog/day14.md | 2 +- 1 file changed, 1 insertion(+), 1 deletion(-) diff --git a/content/blog/day14.md b/content/blog/day14.md index 64e4bc6..3f6765e 100644 --- a/content/blog/day14.md +++ b/content/blog/day14.md @@ -23,7 +23,7 @@ hotel and over the bridge, to pick up Tessa (who had nothing to eat or drink, ye Although there's not one but two superchargers in _Trondheim_, we jet past both because we have enough juice to make it to _Berkåk_. There, an absolute **army of Superchargers** awaits us, with zero people attached to them. No less than twenty of these little plug doodles, each sharing an AC/DC converter at 380V three-phase drawing 192A and delivering 420VDC at 330A continuous. We figured that when in full use (that -is, if there would be twenty Teslas that are thirsty), this site would draw a cool **2.2 Megawatts**, and the best thing? There are three +is, if there would be twenty Teslas that are thirsty), this site would draw a cool **1.4 Megawatts**, and the best thing? There are three additional charger stations, CHAdeMO and CCS/Type2 with space for twelve more cars. I can see how the Norwegians take to their electric vehicles.