Oops, math error. it's 1.4MW here
This commit is contained in:
@ -23,7 +23,7 @@ hotel and over the bridge, to pick up Tessa (who had nothing to eat or drink, ye
|
||||
Although there's not one but two superchargers in _Trondheim_, we jet past both because we have enough juice to make it to _Berkåk_. There,
|
||||
an absolute **army of Superchargers** awaits us, with zero people attached to them. No less than twenty of these little plug doodles, each
|
||||
sharing an AC/DC converter at 380V three-phase drawing 192A and delivering 420VDC at 330A continuous. We figured that when in full use (that
|
||||
is, if there would be twenty Teslas that are thirsty), this site would draw a cool **2.2 Megawatts**, and the best thing? There are three
|
||||
is, if there would be twenty Teslas that are thirsty), this site would draw a cool **1.4 Megawatts**, and the best thing? There are three
|
||||
additional charger stations, CHAdeMO and CCS/Type2 with space for twelve more cars. I can see how the Norwegians take to their electric
|
||||
vehicles.
|
||||
|
||||
|
Reference in New Issue
Block a user